Highway Notices
Urgent closure Notice Divers Bridge 20th March 2025
https://api-gb.one.network/downloads/tm/1142/ttrn-drivers-bridge-road-chapmanslade_142373650_3869910_f142f56600.pdf
Please see the above link to an urgent closure notice for Drivers Bridge Road (part), Chapmanslade commencing 20th March 2025.
To enable: Wiltshire Council to carry out carriageway patching and associated works.
The closure can also be found on one.network here: https://one.network/?tm=142373650
Please direct any queries regarding these works to: [email protected]
Website: https://www.wiltshire.gov.uk/highways-road-closures
Message from National Highways 5th March 2025
A36 Warminster – road closures for resurfacing – 11 to 18 March 2025
We’re resurfacing the A36 at Warminster between Warminster Services and Cley Hill Roundabout. This will maintain and improve safety for everyone using the road. It will also reduce the need for any unplanned closures.
We’ll be carrying out this work overnight, Monday to Friday between 8pm – 6am. This is when there is the least amount of traffic using the road.
The A36 will be closed weeknights from 11 to 18 March, in both directions, between Warminster Services and Cley Hill Roundabout. The road will be open as usual during the day and at weekends.
Access will be maintained to properties directly within the closure. Please speak to the site team to be escorted through the works.
Diversion information
Well signed diversions will be in place in both directions:
Light vehicles
Northbound traffic
o Head West on the A352 / A362 towards Frome
o Join the A361 northbound towards Beckington
o Rejoin the A36 and travel east to access Warminster services / A350
Southbound traffic
o In reverse
HGVs
Northbound traffic
o HGVs will be directed off at Deverill Road / A350 to head south along the A350
o Join the A303 westbound towards Wincanton, exiting at Wincanton to join the A371
o Follow A371 towards Castle Cary
o Follow diversion signage at Shepton Mallett to take Fosse Lane and join A361 EB towards Frome / Beckington
o Rejoin the A36 and travel east to access Warminster services / A350
Southbound traffic
o In reverse
This work is subject to favourable weather conditions, for example heavy rain may affect the progress. If we’re unable to complete our work as planned, we may need to continue beyond the dates stated above.
Please plan ahead and allow extra time for your journeys.
We’ll do all that we can to keep disruption to a minimum. However, we apologise in advance for any inconvenience caused.
Please also remember that closures can change at short notice. You can find live travel information on our Traffic England website:https://www.trafficengland.com/. Or, our travel alerts give details of live incidents on our network: https://nationalhighways.co.uk/travel-updates/travel-alerts/
Help us to spread the word
Please help us by sharing this update. Please share this message with your connections and network, as well as on your own channels.
Any questions?
If you have any queries or comments about the work, or would like further information please contact National Highways Customer Contact Centre on 0300 123 5000 or by email: [email protected]
To keep up-to-date with our work in the South West please visit: https://nationalhighways.co.uk/our-roads/south-west/south-west-maintenance-schemes/ or follow us on X at @HighwaysSWEST
This email may contain information which is confidential and is intended only for use of the recipient/s named above. If you are not an intended recipient, you are hereby notified that any copying, distribution, disclosure, reliance upon or other use of the contents of this email is strictly prohibited. If you have received this email in error, please notify the sender and destroy it.
National Highways Limited | General enquiries: 0300 123 5000 |National Traffic Operations Centre, 3 Ridgeway, Quinton Business Park, Birmingham B32 1AF |https://nationalhighways.co.uk | [email protected]
Registered in England and Wales no 9346363 | Registered Office: Bridge House, 1 Walnut Tree Close, Guildford, Surrey GU1 4LZ
Consider the environment. Please don’t print this e-mail unless you really need to.
https://api-gb.one.network/downloads/tm/1142/notice-2_3ad0702303.pdfhttps://api-gb.one.network/downloads/tm/1142/indicative-plan_141972107_3865801_82ea05973a.pdf
Please see the above links to the Notice and Indicative Plan for a Temporary Traffic Regulation Order (TTRO) for A350 (Part), Westbury commencing 24th April 2025.
To enable: Wessex Water to carry out cover and associated works. For the diversion route symbolisation triangles (all other traffic) clockwise and circles anticlockwise (HGV).
The closure can also be found on one.network here: https://one.network/?tm=141972107
Diversion agreed with National Highways under NEM 420085
Please direct any queries regarding these works to: [email protected] Tel: 01225 713497
Website: https://www.wiltshire.gov.uk/highways-road-closures
A notice from National Highways
A36 Limpley Stoke carriageway repairs and stabilisation
We’re carrying out essential safety improvements on the A36 Warminster Road near Limpley Stoke to stabilise the embankment and keep the carriageway safe.
Start date August 2024. End date Spring 2025
Highway Improvements Requests
The system for requesting highways improvements to Wiltshire Council is initially through the Parish Council as set out below.
|
|
Highways Maintenance
The Parish Steward visits the village regularly, to undertake minor repairs such as small pot holes and blocked gulleys.
Please report any such issues to Councillor Adam Oakley at [email protected]
More major maintenance issues should be reported to Wiltshire Council using the My Wiltshire App at http://my.wiltshire.gov.uk
This should also be used for reporting dog fouling and fly tipping.